Boeing H47 Factory, Photo by Ralph V. Oswald III

Boeing H-47 Chinook Focus Factory Conversion

Multiple, complex renovations were executed around 24/7 helicopter production, without delay or disruption and with impeccable safety.
Weygand Residence Hall, Photo by Esto Photographics

Bridgewater State University, George A. Weygand Residence Hall

Tablet-based BIM 360 supported off-site fabrication of key components, helping to mitigate risk and meet a very tight schedule.
Catskill/Delaware Ultraviolet Light Disinfection Facility

Catskill/Delaware Ultraviolet Light Disinfection Facility

The project鈥檚 complexity is not only in its technology and construction processes, but in its size and scale.
Cherokee Health Systems

Cherokee Health Systems Crisis Stabilization Unit

Collaboration and prefabrication helped meet an extreme deadline situation with a flexible new facility.
DeSales University Gambet Center for Business and Healthcare Education

DeSales University Gambet Center for Business and Healthcare Education

Construction was encumbered by unusually wet fall and winter seasons.
FBI Field Office, Norfolk, VA, Photo Courtesy of U.S. GSA

FBI Field Office

Innovative management of design reviews, schedules, RFIs, change orders, compliance..plus reliance on BIM...helped streamline a complex and fast-paced project.
Franklin County Regional Intermodal Facility

Franklin County Regional Intermodal Facility

A stream was relocated by 500 feet, and innovative Roller Compressed Concrete was applied in two lifts, despite high air temps and winds.
Photo Courtesy of Metro Gold Line Foothill Extension Construction Authority

Gold Line Bridge

"...to design and build the bridge better than was ever done before."
I-64/Battlefield Boulevard Interchange

I-64/Battlefield Boulevard

CM innovation helped deliver eight new traffic lanes, four new bridges, and more...
JFK Airport Terminal 4 Redevelopment Program, Phase I

John F. Kennedy International Airport Terminal 4 Expansion Phase I

"Not unlike performing open-heart surgery on a patient who is simultaneously running a marathon.鈥
John Wayne Airport, Orange County, Terminal C Construction

John Wayne Airport, Orange County, Terminal C Construction

...one of the largest public works projects in Orange County鈥檚 history.
Little League Museum, South Williamsport, PA.

Little League Museum Renovations

"The integrated team proved that projects of any size can realize the benefits of effective construction management."
Los Angeles City College Student Union

Los Angeles City College Student Union

...a complex project because of its inherent design that required the overlap and integration of building elements between a three-tiered outdoor plaza and a three-story building.
Mertes Center for the Arts Auditorium

Mertes Center for the Arts, Las Positas CC

"Leadership by influence and example" shepherds a complex project through a multitude of competing needs and demands.
Mount Nittany Medical Center

Mount Nittany Medical Center Lance and Ellen Shaner Cancer Pavilion

The walls had to be removed while maintaining the structural integrity of the existing structure and new addition above...
Muhlenberg College - Seegers Union Building. Addition and Renovations.

Muhlenberg College - Seegers Union Building Addition and Renovations

...uninterrupted service of 6,000 daily meals, continuous operation of the loading dock serving both kitchen and bookstore...
New York City Hall Photo Courtesy of Bob Zucker, Corporate Photographics

New York City Hall Rehabilitation

An historic building, a dense urban setting, and ongoing operations added up to a major challenge.
NYC DEP Newtown Creek South Battery Overview, Photo by Bernstein Associates

NYC DEP Newtown Creek WWTP South Battery Upgrade

New York City's largest wastewater treatment plant gets a complete -- and complex -- upgrade.
NYC DEP Newtown Creek Central Residuals Building Overview, Photo by Bernstein Associates

NYC DEP, Newtown Creek WWTP, Central Residuals Building

4-D modeling helped the CM manage multiple prime contractors and meet a very aggressive schedule.
Rangely Replacement Hospital

Rangely Replacement Hospital

A very public and closely watched project challenged the owner and CM to keep an entire community "in the loop."
Red Lion Energy Center

Red Lion Energy Center

The highest output fuel cell power generating facility in the world, designed and built on a super-condensed schedule...
State College

State College Area Schools District-wide Facilities Master Plan Phase I.

The project had a 12-week window in the summer to complete all work in and impacted by the renovation portion...
The Pennsylvania State University - Gaige Technology and Business Innovation Building

The Pennsylvania State University - Gaige Technology and Business Innovation Building

The Butz team volunteered their time to participate in many student functions and career days.
U.S. Army Corps of Engineers, Aberdeen Proving Ground C4ISR Base Realignment and Closure (BRAC) Program, Phase II

U.S. Army Corps of Engineers, Aberdeen Proving Ground C4ISR Base Realignment and Closure (BRAC) Program, Phase II

Approximately 7,400 personnel moved to APG from the C4ISR community located in Ft. Monmouth NJ.
Virginia Polytechnic and State University Center for the Arts

Virginia Polytechnic and State University Center for the Arts

A combination of CM-At-Risk and Agency CM brought together extensive expertise that enabled the team to respond to unforeseen site conditions and keep this high visibility project on track.
washington dc

Washington Monument Earthquake Repair

Working high above the nation's capital to repair earthquake damage to an iconic structure.
Weeksville Heritage Center Photo (c) Nick Lehoux for Caples Jefferson Architects

Weeksville Heritage Center

A carefully, sensitively restored site pays tribute to a thriving 19th century African-American community in Brooklyn, New York.
West Hollywood Library Project

West Hollywood Library Project

The most critical challenge in management of the project was achieving high-quality finishes from the trades for the custom and unique features that were part of the design, despite the low-bid delivery that can lead to shortcuts.
Williamsburg Landing

Williamsburg Landing Building Remediation and Remodeling

Remediation of design flaws, plus remodeling and improvements without disruption to building residents.